| El Nino Ventures Inc. continues to intersect High Grade Zinc, Gold and Silver Over Significant Intervals at Murray Brook Polymetallic Deposit, Bathurst Mining Camp, New Brunswick |  view PDF |
ELN June 27 2012
- Significant drill results;
include:
-
4.66% zinc, 1.55%
lead,
1.451 gpt gold
and 57.4 gpt silver over 7.05
metres in MB‐2012‐98
-
2.66% zinc, 1.13%
lead, 1.05 gpt gold and 56.84
gpt silver over
75.00
metres in MB‐2012‐97
- 1.53% zinc, 0.73% lead,
0.72 gpt gold and 35.71 gpt
silver over
111.0
metres in MB‐2012‐91
- 97 holes have been successfully
completed for a total of 18,467
metres
- Votorantim and El Nino spent
approximately $4.5 million from
November 2010 to date
June 27, 2012, Vancouver,
Canada; El Nino Ventures Inc. ("ELN" and
the "Company") (TSX.V: ELN; OTCQX:ELNOF
Frankfurt: E7Q) is pleased to announce
additional high-grade results over
significant intervals obtained from
holes drilled during its 2012, 18,000
metre drill program at the Murray Brook
massive‐sulfide deposit, in the Bathurst
Mining Camp of New Brunswick, Canada.
The Company has received and confirmed
assay results from drill holes
MB-2012-90 to MB-2012-101. A complete
list of the intercepts from the 2012
drill program is provided in Table 1.
The widths of the intercepts are
approximate to the true width of the
mineralized intercept.
The drill program commenced on February
9, 2012 and to date, 97 holes have been
successfully completed for a total of
18,467 metres. The entire drill program
consists of 164, vertical drill holes;
totalling approximately 28,500 m. Figure
1 illustrates the location of 2012 drill
holes.
Discussion:
On the basis of work completed to date,
two important observations and
conclusions can be made:
- The program was successful in
confirming the continuity of the
massive sulfide mineralization at
the Murray Brook deposit;
- Results of the 2012 drill
program have been successful in
identifying two distinct massive
sulfide zones with different
mineralogical characteristics and
thickness. Western Zone appears
thicker and more Zn-Pb- Ag rich and
Eastern Zone is thinner and more
Cu-Au rich (Figures 2 and 3)
illustrates Murray Brook Massive
Sulfide thickness at 10 metre
contours.
1 Source: Voterantim
Metals Canada
About 2012-2013 Exploration
Program:
A minimum $3 million budget has
been proposed for the 2012‐2013
exploration program. The budget includes
$2.5 million for diamond drilling work
on the Murray Brook deposit and a
$500,000 exploration geophysical program
on Murray Brook property and the
adjacent Camel Back property (Figure 3).
The objective of this exploration
program is to explore for VMS deposits
at depths of up to 200 metres below
surface. The Camel Back property is
located in the area between the Murray
Brook deposit to the west, which is the
largest open pittable massive sulfide
deposit in the Bathurst Mining Camp
(BMC), and the Caribou deposit to the
east, which is the second largest
deposit in the camp with historic
resources of some 65 million tonnes.
2012 Program consists of
- $2.5 million budgeted for drill
programs for measured resources
- 18,000 metre drill program
began February 2012
- Delineate the outer
perimeter of the Murray Brook
deposit and advance the
resources into the measured
(highest confidence) category.
- $0.5 million budgeted for
exploration of the Murray Brook
Property
- Mapping and prospecting;
- Ground gravity geophysics
- 2000 metres of drilling with
bore-hole EM surveys
- Metallurgical studies
underway to compliment
completion of a planned PEA Study in
Q1 2013
The Exploration Agreement
Votorantim is the Operator of the Murray
Brook Project. In January 2011, ELN
announced that it provided notice to
Votorantim to enter into a Participation
Agreement on the Murray Brook
polymetallic massive sulfide deposit
situated in the Bathurst Mining Camp in
New Brunswick, Canada. (See news release
dated January 20, 2011).
Under Votorantimʹs Option and Joint
Venture Agreement with Murray Brook
Minerals Inc. and Murray Brook Resources
Inc., both privately held companies,
Votorantim can earn a 50% interest in
the properties by funding $2,250,000 in
exploration expenditures and making
payments totalling $300,000 over a three
year period that commenced November 1,
2010. Votorantim can earn an additional
20% interest in the properties by
funding an additional $2,250,000 in
exploration expenditures over an
additional two year period. ELN has
elected to enter into a participation
agreement wherein it can earn 50% of
Votorantim's interest by paying 50% of
the costs incurred by Votorantim in the
Option and Joint Venture Agreement.
On May 10, 2012 ELN announced that
Murray Brook Minerals Inc. has been
given formal notice by ELN and
Votorantim Metals Canada ("Votorantim")
of a 50% earned interest in the
Murray Brook, polymetalic project,
Bathurst, New Brunswick. MBM has also
been provided with a valid notice that
ELN and Votorantim are exercising their
option to acquire and become owner of an
additional 20% (for a total of 70%)
beneficial interest in the Murray Brook
mining claims.
Qualified Persons Statement
This news release has been reviewed and
approved for technical content by Ali
Hassanalizadeh M.Sc. P.Geo a qualified
Person under the provisions of National
Instrument 43‐101.

Figure
1 - Plan view of the Murray Brook
polymetallic massive sulfide deposit and
drill holes locations

Figure 2 - Cross Section of Murray
Brook deposit; looking northeast.
Location of the section is highlighted
in the index map at the left top corner

Figure 3- Plan view of Murray Brook
Massive Sulfide thickness 10 metre
contours
Table‐1
Composited drill hole intercepts

**The
composite assays provided are of massive
sulfide intersections only employing a
0% Zn cutoff

Figure 4 - Land tenure map showing the
location of the Murray Brook Project
Bathurst Mining Camp, New Brunswick
About El Niño Ventures Inc.
Bathurst Projects
- Bathurst Mining Camp Project:
(Tri-Party Agreement)
Consists of an initial 4,712
claims in the Tri‐Party Agreement
with Xstrata & Votorantim whereby
Votorantim may incur exploration
expenditures of $10 million over a
period of 5 years to earn a 50%
interest. Votorantim may further
increase its interest to 70% by
spending an additional $10 million
over 2 years.
- Murray Brook Project:
The Murray Brook project, which
has an excellent infrastructure,
is the largest open-pitable massive
sulfide deposits in the Bathurst
Mining Camp. Votorantim can earn
up to a 50% interest in the Murray
Brook Project by funding $2,250,000
of exploration expenditures over a
period of 3 years. Votorantim may
acquire a further 20% by incurring
an additional $2.5 million in
exploration costs over an additional
two year period. ELN has elected to
participate by paying 50% of
Votorantim's exploration costs
during the earn-in period.
In 2011, ELN and Votorantim spent
$2.1 million on exploration; and
completed 10,000 metres of drilling.
Drill results to date have been
encouraging.
The first NI 43‐101 Mineral Resource
Estimate for the Murray Brook Zn‐Cu‐Pb‐Ag‐Au
deposit, which includes explanatory
footnotes, is presented in the table
below (see ELN press release dated
February 28, 2012). The resource
estimate is based on various assumptions
regarding mining methods, processing and
metal recoveries, payable metal NSR
credits and metal prices. This estimate
makes no provision for capital costs to
mine the deposit, nor mill the material
mined, as resources are not reserves.
Murray
Brook Mineral Resource Estimate Summary

Mineral resources which are
not mineral reserves do not have
demonstrated economic viability.
The estimate of mineral
resources may be materially affected by
environmental, permitting, legal, title,
taxation, socio-political, marketing, or
other relevant issues.
- The quantity and grade of
reported Inferred resources in this
estimation are uncertain in nature
and there has been insufficient
exploration to define these Inferred
resources as an Indicated or
Measured mineral resource and it is
uncertain if further exploration
will result in upgrading them to an
Indicated or Measured mineral
resource category.
- The mineral resources in
this news release were estimated
using the Canadian Institute of
Mining, Metallurgy and Petroleum (CIM),
CIM Standards on Mineral Resources
and Reserves, Definitions and
Guidelines prepared by the CIM
Standard Committee on Reserve
Definitions and adopted by CIM
Council
- The Dec 31, 2011 two year
trailing average US metal prices
used in this estimate were $3.71/lb
Cu, $1.03/lb Pb, $0.98/lb Zn,
$1,397/oz Au, $27.63/oz Ag. The
C$/US$ Exchange rate was 0.99.
- Overall payable metal in the
NSR calculation were 81% Cu, 72% Pb,
64% Zn, 71% Au and 56% Ag.
- Mineral resources were
determined within a Whittle pit
shell with 45 degree slopes
utilizing mining costs of C$2.50/tonne
for mineralized material and waste
rock, and C$1.75/tonne for
overburden.
- Costs used to determine the
C$20/tonne NSR resource cut-off
value were processing at C$15/tonne
and G&A C$5/tonne.
- The Murray Brook Mineral
Resource Estimate was undertaken by
Eugene Puritch, P.Eng. of P&E Mining
Consultants Inc.
2012 NI 43-101 Mineral Resource
Estimate is filed on SEDAR.com
Votorantim Metals Canada Inc.
Statement:
Technical details in this news release
were provided by Votorantim whose
professional geologists conduct
operations consistent with mineral
industry best practices. Votorantim
accepts no responsibility for this news
release or any inferences made from the
technical details provided herein.
About Murray Brook Minerals Inc.
Murray Brook Minerals Inc. is a
privately owned mining exploration
company, owner of one of the largest
deposit of the Bathurst Mining Camp,
(New Brunswick, Canada) the Murray Brook
Deposit, as well as of the Camel Back
Property consisting of 215 claims.
About Votorantim Metals Canada Inc.
Votorantim Metals Canada Inc. is a
subsidiary of Votorantim Metais; a
company that is part of the Votorantim
Group that was founded in Brazil in 1918
operates in twenty countries and has
over forty thousand employees.
Votorantim Metais is the largest
electrolytic‐nickel producer in Latin
America and one of the world's leaders
in the production of zinc, aluminum and
nickel.
About El Nino Ventures Inc.
El Niño Ventures Inc. is an
international exploration company,
focused on exploring for lead, zinc,
copper, gold and silver in New
Brunswick, Canada and copper in the
Democratic Republic of Congo ("DRC").
On Behalf of the Board of Directors
"Harry Barr"
Harry Barr Chairman & CEO El Nino Ventures Inc.
Further Information: Tel: +1 604 685
1870 Fax: +1 604 685 8045 Email: info@elninoventures.com or visit www.elninoventures.com 650-555 West 12th Avenue, City Square, West Tower, Vancouver, B.C.,
Canada, V5Z 3X7
Neither the TSX Venture Exchange
nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the
adequacy or accuracy of this release.
Cautionary Note Regarding Forward Looking Statements. Note: This
release contains forward-looking statements that involve risks and
uncertainties. These statements may differ materially from actual
future events or results and are based on current expectations or
beliefs. For this purpose, statements of historical fact may be
deemed to be forward-looking statements. In addition,
forward-looking statements include statements in which the Company
uses words such as "continue", "efforts", "expect", "believe",
"anticipate", "confident", "intend", "strategy", "plan", "will",
"estimate", "project", "goal", "target", "prospects", "optimistic"
or similar expressions. These statements by their nature involve
risks and uncertainties, and actual results may differ materially
depending on a variety of important factors, including, among
others, the Company's ability and continuation of efforts to timely
and completely make available adequate current public information,
additional or different regulatory and legal requirements and
restrictions that may be imposed, and other factors as may be
discussed in the documents filed by the Company on SEDAR (www.sedar.com),
including the most recent reports that identify important risk
factors that could cause actual results to differ from those
contained in the forward-looking statements. The Company does not
undertake any obligation to review or confirm analysts' expectations
or estimates or to release publicly any revisions to any
forward-looking statements to reflect events or circumstances after
the date hereof or to reflect the occurrence of unanticipated
events. Investors should not place undue reliance on forward-looking
statements. |
|
|
| You can view the Next News Releases item: Tue Jul 17, 2012, El Nino Ventures Inc. Drills 9.23 % Zinc, 108.7 gpt Silver, 0.18 % Copper, 0.336 gpt gold and 2.58% Lead Over 31 Metres at Murray Brook Polymetallic Deposit Bathurst Mining Camp, New Brunswick
You can view the Previous News Releases item: Mon Jun 25, 2012, El Niño Ventures Inc. Announces $2,000,000 Brokered Private Placement
You can return to the main News Releases page, or press the Back button on your browser.
|